
Overview of Ken McCorry’s Conrail Railroad
Ken McCorryDescription
Allen Keller asks Ken why he built this layout over 1,500 feet long. Ken wanted to be able to run 40 car trains on a long mainline run through many recognizable scenes. The layout seems a bit overwhelming when one first beholds it. This HO railroad has its own 32 by 80 foot building with a 24 by 32 foot addition to make over 3,300 square feet. If this wasn’t large enough, Ken has stacked the layout so that in some places there are five levels. The highest and lowest levels serve as his staging and most of the visible action is on levels three and four. The tour of the Conrail railroad begins with a string of ore cars around the layout. After traveling over 240 feet of hidden track, the train becomes visible at Sunbury. For more Allen Keller videos, visit the Model Railroad Academy archives.
This is Ken McCorry's massive Conrail layout. It's reported to be the largest home layout in the world. But that was not Ken's objective. He just wanted to build a railroad so he could recreate his favorite part of Pennsylvania in the early 1980s. The layout follows the route of the old Pennsylvania Railroad from Harrisburg, Pennsylvania to Buffalo, New York.
It takes a train about 45 minutes to run the full length of this HO railroad. That means the main line is 25 scale miles long. Adding to the operating interest is Keating Summit. It's 3% grade requires the use of helpers. Welcome, I'm Allen Keller.
And this is Ken McCorry, the builder of the fabulous Conrail layout that you see. Ken, why did you build this layout over 1,500-feet long? Allen, I wanted to be able to run 40-car trains on a long main line run through many recognizable scenes. Upon first seeing this Conrail layout, it's a bit overwhelmed. This HO railroad has its own 32 x 80 foot building with a 24 x 32 foot addition.
That's over 3,300 square feet. And if that weren't large enough, Ken has stacked the layout so in some places there are five levels. The highest and lowest levels serve as hidden staging. And most of the visible action is on levels three and four. For clarity, this plan shows only these two levels.
We're going to follow a string of four ore cars around the layout. After traveling over 240 feet of hidden track, the train becomes visible at Sunbury.
Why am I only able to see the first 2 min 10 sec of this video?